Laserfiche WebLink
<br />;;:r? <br /> <br />. <br /> <br />. <br /> <br />< , <br /> <br />~ .,,' <br /> <br />APPENDIX A <br /> <br />SCOPE OF SERVICES <br /> <br />The proposed services are divided into three phases to establish an efficient <br />work sequence Rnd to limit the services to those essential to an adequate <br />review. The estimated costs are based upon availability of pertinent data <br />and free exchange of information with the Design Engineer. No allowance has <br />been made for additional exploration or testing. <br /> <br />Phase I <br /> <br />Gcoloi\Y Review <br /> <br />. Review of all available foundation exploration and test results, <br />design and construction drawings, geologic and topographic maps <br />and photos, and other pertinent data. <br /> <br />. Detailed aite inspection of surface features of the abutments <br />and reservoir shoreline and of samples from foundation explor- <br />ation. <br /> <br />. Report summarizing existing geologic conditions and anticipated <br />effect of dam and reservoir upon stability of abutments and <br />shoreline alopes. <br /> <br />Es tima ted Cos t <br /> <br />$ 2,300 <br /> <br />Phaso'II DesiHn Review <br /> <br />. Review of Phase I data and conclusions plus soil tests of <br />embnnkment materials, stability and seepage analyses, and <br />construction specifications. <br /> <br />. Site inspection including borrow areas and existing soil samples. <br /> <br />. Report summarizing conclusions and recommendations as to any <br />additional exploration and testing and any design modifications <br />to improve abutment stability. <br /> <br />Estimated Cost <br /> <br />$ 5,290 <br /> <br />Phase III Constructibility Review <br /> <br />. Review of available data and site inspection (included in Item II). <br /> <br />. Review of stream flow and weather conditions as they affect <br />construction. <br /> <br />. Evalustion of design, specifications, and schedule with a view <br />to minimizing bid prices, claims, and delays. <br /> <br />. Report summarizing recommendations. <br /> <br />Estimated Cost <br /> <br />$ 2,.1 85 <br />$ ~,775 <br /> <br />Total Estimated Cost <br /> <br />APPENDIX A <br /> <br />.-"u.,. , '" ... ,~.._ _ <br />