My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153514 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153514 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:54:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153514
Contractor Name
Farmers Water Development Company
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.0 <br /> <br />REMEDIAL PROGRAMS SCOPE AND PURPOSE <br /> <br />The purpose of the overall remediation program at Gurley Reservoir <br />is to address the dam safety issues identified by the Colorado Office of <br />the State Engi neer in the zero storage restri cti on 1 etter of December <br />15, 1986. The letter states that an acceptable repair plan must, as a <br />minimum, include the following items: <br /> <br />1. Seal i ng of all sources of 1 eakage into the condui t and valve <br />tower; <br />2. Filling of any voids which exist adjacent to the outside of <br />the conduit to restore the structural integrity of the outlet; <br />3. Repair of all areas of cavitation in the outlet; <br />4. Repair of the gate seats to significantly reduce leakage; <br />5. Replacement of the air relief system; and <br />6. Restoration of the integrity of the embankment and foundation <br />in areas where piping (internal erosion) has occurred. <br /> <br />The emergency repa i r (Phase 1) <br />Reservoir during April 1987 addressed <br />remediation work tasks, including: <br /> <br />program compl eted <br />the most serious <br /> <br />at Gurl ey <br />short-term <br /> <br />1. Grouting of voids around the outside of the outlet conduit <br />tunnel from the inside of the conduit using a <br />cement/water/sand grout mix to minimize the flow of water and <br />piping of soil solids into the outlet conduit; <br /> <br />2. Mortaring of open weepho1es, large voids and leaking joints in <br />the original concrete tunnel lining as an additional defense <br />against the inflow of water and piping of soil; and <br /> <br />3. Backfilling the nine existing sinkholes with cement/water/sand <br />grout to minimize future inflow along these flow channels and <br />mitigate possible loosening of the neighboring embankment and <br />foundation materials due to progressive sinkhole collapse. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.