My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153514 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153514 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:54:38 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153514
Contractor Name
Farmers Water Development Company
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I FI GURE 1 <br />FIGURE 2 <br />I FIGURE 3 <br />FIGURE 4 <br /> FI GURE 5 <br />I FIGURE 6 <br />I FIGURE 7 <br />FI GURE B <br /> FI GURE 9 <br />I FIGURE 10 <br />I FI GURE 11 <br />I FIGURE 12 <br />FIGURE 13 <br />I FIGURE 14 <br />FIGURE J-l <br />I FIGURE J-2 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LIST OF FIGURES <br /> <br />COVER SHEET <br /> <br />GENERAL FACILITIES ARRANGEMENT MAP <br /> <br />PLAN OF EMBANKMENT, IMPOUNDMENT AREA AND GEOLOGIC MAP <br /> <br />PLAN OF EMBANKMENT AND FIELD EXPLORATION MAP, GURLEY RESERVOIR <br /> <br />PLAN AND CROSS-SECTION OF EXISTING OUTLET CONDUIT, GURLEY <br />RESERVOIR <br /> <br />EMBANKMENT AND FOUNDATION CROSS-SECTION, GURLEY RESERVOIR <br /> <br />SELF POTENTIAL EQUIPOTENTIAL CONTOUR MAP, GURLEY RESERVOIR <br /> <br />MAP OF HIGH RESISTIVITY ZONES, GURLEY RESERVOIR <br /> <br />PLAN AND SECTIONS OF REHABILITATED OUTLET STRUCTURE, GURLEY. <br />RESERVOIR <br /> <br />GURLEY RESERVOIR OUTLET CONDUIT REHABILITATION PLAN AND <br />PROFILE (SHEET 1 OF 2) <br /> <br />GURLEY RESERVOIR OUTLET CONDUIT REHABILITATION PLAN AND <br />PROFILE (SHEET 2 OF 2) <br /> <br />DETAIL SHEET, OUTLET WORKS REHABILITATION <br /> <br />PLANS AND SECTIONS, FOUNDATION GROUTING, GURLEY RESERVOIR <br /> <br />GURLEY RESERVOIR ELEVATION - AREA - CAPACITY RELATIONSHIP <br /> <br />PROPOSED OUTLET WORKS ENERGY AND HYDRAULIC GRADE LINE AT <br />MAXIMUM RESERVOIR WATER SURFACE (APPENDIX J) <br /> <br />GURLEY RESERVOIR EXISTING AND PROPOSED OUTLET WORKS STAGE <br />DISCHARGE CURVES FOR FULLY OPEN GATE (APPENDIX J) <br />
The URL can be used to link to this page
Your browser does not support the video tag.