My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.-'; <br /> <br />~ <br /> <br />TASK ES.O ALTERNATIVE RESERVOIR SITES <br /> <br />Puroose: Initiate a preliminary analysis of 4 reservoir sites suggested by study area participants, <br /> <br />Methodolol!v: Evaluate reservoir sites at a very preliminary pre-reconnaissance level Based on preliminary <br /> <br /> <br />fmdings and other factors. the CWCB will decide if further analysis is to be made. <br /> <br />The following work items are included in th,: alternative reservoir sites task: <br /> <br />ES,l Data Gatherin" and Review - Boyle will perform preliminary review and data gathering <br />activities for additional reservoir sites suggested by study area participants, These sites are Ed <br />Joe Draw. Turner Creek, Beaver Canyon, and Nelson Reservoir (McCulloch Creek). Any <br /> <br /> <br />analyses performed at this stage will be approximate and at a preliminary pre,reconnaissance <br /> <br /> <br />level of detail Should convincing evidence of the unsuitability of a site be discovered at any <br /> <br /> <br />point in the investigation of that site, the investigation of that site can be stopped with the <br /> <br /> <br />approval of the ewCB. A maxilnum of seven (7) engineer clays total will be spent on this sub- <br /> <br /> <br />task. <br /> <br />ES.2 Memorandum - Boyle will prepare a memorandum to the ewCB summarizing the fmdings of <br /> <br /> <br />the preliminary review of the alternative r",;ervoir sites. The memorandum should be concise <br /> <br /> <br />and limited to approximately three (3) p~<ges of text. Coordination and discussion of the <br /> <br /> <br />findings presented in the memorandum will be accomplished by phone contact. <br /> <br />Products: <br /> <br />Concise summary memorandum (3 pages) of the findings of the preliminary review of the <br />alternative reservoir sites. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.