My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e:- <br /> <br />e-, <br />{ ) <br /> <br />El.4 Sensitivity Analvsis ' A limited sensitivity analysis of estimated maximum ditch capacities will <br /> <br />be performed with respect to the effect of measurement error and assumptions made in <br /> <br />hydraulic calculations. The findings of this analysis will be reviewed with the CWCB to <br /> <br />determine whether the maximum ditch capacities estimated are adequate for the purposes of <br /> <br />this study. If further refinement is deeme,:1 necessary by the CWCB, Boyle will prepare and <br /> <br />submit to the CWCB a scope of work and budget to perform the work. <br /> <br />El.5 Coordination and Review, For wordination and review purposes, one meeting between Boyle <br /> <br />and the CWCB "ill be held during the preparation phase (4 hrs,) and one meeting will be held <br /> <br />during the initiation phase (2 hrs.) of the flow measurement program, <br /> <br />Products: <br /> <br />Compiled field data of diversion structure dimensions, ditch geometry, recorded stage heights, <br /> <br />and measured flows. This information will be prepared for presentation and distribution as a <br /> <br />part of Task E3,O, Instructional materials f,)r the current metering program will be prepared. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.