My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.-) <br /> <br />~) <br /> <br />curves for the gage sections will be developed by a series of current meter measurements <br /> <br /> <br />covering as wide a range of flows as practicable, Ditch company personnel will periodically <br /> <br /> <br />record stage heights at each gage with special emphasis on noting the maximum stage attained <br /> <br /> <br />during the 1988 runoff season. Hydraulic ,:alculations will be used to estimate the maximum <br /> <br /> <br />capacity for each ditch should the maximum recorded discharge for the season be less than the <br /> <br /> <br />maximum ditch capacity, <br /> <br />For the Gurley Intake Ditch, the capacities for each diversion structure and the limiting <br />section of each ditch reach between diver,aon structures will be estimated. Ditch company <br /> <br /> <br />personnel will assist in the identification of the section limiting the capacity of each ditch reach <br /> <br /> <br />between diversion structures, Diversion structure capacities will be estimated based on <br /> <br /> <br />hydraulic calculations using the dimensions and flow conditions of each structure and current <br /> <br />meter data collected for one flow. Ditch capacities at the limiting sections between diversion <br />structures will be estimated from ditch gl:ometry data, depth of flow measurements in the <br />ditch, and an associated discharge measured either at the diversion structure immediately <br />upstream or at the cross section, If no !,ignificant inflows to the ditch occur between the <br />limiting cross section and the diversion structure. the flow measured at the diversion structure <br /> <br /> <br />will be used, If significant inflows are observed between the limiting cross section and the <br /> <br /> <br />upstream diversion structure. the flow will be measured at the cross section. The approximate <br /> <br /> <br />diversion structure dimensions and ditch geometry will be measured using a hand leve~ <br />surveyors rod, and cloth tape. <br /> <br />For the Lilylands Canal, the maximum capacity of the canal immediately downstream of <br /> <br /> <br />Lilylands Reservoir and at the bifurcation point into the North and South Laterals will be <br /> <br /> <br />estimated. Canal C'lpacities will be estimat(:d from hydraulic calculations using canal geometry <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.