My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.--oj <br /> <br />~ <br /> <br />. <br /> <br />The following meetings .or workshops in Norwood with involved <br />parties to be attended by Boyle personnel are anticipated: <br /> <br />Demand Operations Workshop: one day workshop <br />Shareholder's Meeting: one four-hour meeting <br />Summary Meetin!j: one two, hour meeting <br /> <br />The following workshop in Denver with involved parties to be <br />attended by Boyle personnel is anticipated. <br /> <br />Planning Tool Training Workshop: one four-hour <br />workshop <br /> <br />For the purposes of estimation, all meetings between Boyle and . <br />the CWCB are assumed to be in the offices of Boyle. Three trips <br />are assumed to the study area for meetings or workshops, one <br />each for the Summary Meeting, the Shareholder's Meeting and <br />the Demand Operations Workshop, The Training Workshop will <br />be held in the Denver offices of Boyle, The time estimates shown <br />in the Task Cost Report for the workshops and meetings include <br />time for conducting as well as preparing for the <br />workshop/meetings, <br /> <br />Products: <br /> <br />Materials as required for presentation at the meetings. <br /> <br />6) SUMMARY AND SUPPLEMENTAL REPORTS <br /> <br />Puroose: <br /> <br />Produce a brief summary report of study procedures. findings, <br />conclusions, and recommendations. <br /> <br />Methods: <br /> <br />A summary report' describing study procedures, findings, <br />conclusions, and recommendations will be developed prior to the <br />1990 irrigation season, The report is anticipated to be a concise <br />document approximately 30 pages (total) in length. A format <br />similar to that followed for the Data Collection Report is <br />anticipated, A general distribution of the report is not anticipated. <br /> <br />A draft of the report will be submitted to the CWCS for review. <br />Comments and suggestions received will be addressed in, the <br />final version. Produc~ion of the final report will be the <br />responsibility of Boyle. <br /> <br />A supplemental report will be developed at the end of the 1990 <br />irrigation season to summarize any modifications made to the <br />operating plan over the, course of the season and provide an <br />assessment of the progr,~m, The report is anticipated to be a very <br />brief document, approximately 10 pages (total) in length, A <br />format similar to that followed for a technical memorandum is <br />anticipated, The report preparation and distribution procedures <br />outlined for the Summary Report will be followed for the <br />Supplemental Report, <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.