My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00424
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:54:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Products: <br /> <br />5) MEETINGS <br /> <br />Puroose: <br /> <br />Methods: <br /> <br />-- <br />( ) <br /> <br />~ <br /> <br />The information gathered during these trips will be compiled into a <br />Supplemental Report as described in Task 6, The compilation of <br />experience gained over the 1990 irrigation season and <br />assessment of the seasons operations should be of value in <br />formulating operating plans for the next season. <br /> <br />For the purposes of estimation, it is assumed that one member of <br />Boyle's senior staff will make the trips, A total of not more than <br />four days will be spent in the study area during these trips, but the <br />distribution of the time among the trips will be established as the <br />season progresses. The timing of the trips will also be <br />established as the season progresses. but about one trip each <br />during the months of May and June are anticipated. Subsequent <br />monitoring activities will be conducted via telephone. <br /> <br />Monitoring and recordkeeping of actual operations (ditches. <br />reservoirs. flow measuring devices, etc.) will be the responsibility <br />of the ditch companies. <br /> <br />Boyle will conduct a half-day training session (see Task 5) at the <br />end of the monitoring program to transfer the ability to run the <br />planning tool to SCS. CWCB. and ditch company personnel. The <br />session will be in Denver and be attended by no more than five <br />individuals. <br /> <br />o <br /> <br />Reid notes and records to be used in compilation of the <br />Supplemental Report. <br /> <br />o A summary memorandum of observations prepared after <br />each trip. <br /> <br />Promote communications among all involved parties, transfer <br />information, and facilitate the completion of the study efforts. <br /> <br />Meetings between Boyle and the CWCB will be held for study <br />coordination purposes and review of study fil'ldings and <br />procedures, Meetings and workshops with other involved parties <br />and local study participants will be held to coordinate activities. <br />exchange ideas. and explain study procedures and results, <br /> <br />The following meetings between Boyle and the CWCS are <br />anticipated: <br /> <br />Initiate Efforts: one two-hour meeting <br />Preparation for Workshop: one four,hour meeting <br />Summary Meeting: one four,hour meeting <br /> <br />Ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.