<br />~) <br /> <br />,,) <br /> <br />14) OPERATION STUDIES <br /> <br />Puroose: <br /> <br />Methods: <br /> <br />Products: <br /> <br />Investigate the reliable yield of an enlarged Lilylands Reservoir. <br /> <br />The operation of an enlarged Lilylands Reservoir in combination with the <br />selected canal size will be simulated using the reservoir operations <br />program used in the previous phase of the study, The approximate size <br />of the en'arged reservoir which would most likely satisfy capital cost <br />selection criteria (see Task 16) will be selected on the basis of information <br />developed in Phase I ' Extended investigations. Area-capacity and flow <br />data developed as described in Tasks 13 and 14, respectively. will be <br />used as input to the model. The 1951,1983 period of study will be used <br />to perform the evaluation, The cropping pattern and water demands <br />used for the Phase I,Extended investigation will be used for this analysis, <br />Yield will be defined using the 80 percent reliable, full-season water <br />supply criteria defined in the Phase I-Final Report, Baseline yield will be <br />the 1400 AF /YR value reported in the Phase I ' Final Report. <br /> <br />The operation studies are assumed, for the purposes of estimation, to <br />consist of evaluation of the reliable yield of the initial reservoir size and a <br />subsequent refinement of the reservoir size based on the information <br />developed during this analysis, <br /> <br />The selected reservoir size and a reliable yield (AF jYR) estimate for the <br />selected reservoir enlargement and intake canal size, <br /> <br />15) COST ESTIMATES <br /> <br />Puroose: <br /> <br />Methods: <br /> <br />Products: <br /> <br />Estimate the costs associated with the reservoir enlargement and <br />construction of the intake canal. <br /> <br />Costs will be estimated for the selected size of the Lilylands Reservoir <br />enlargement and for the selected intake canal size at a pre-feasibility level <br />of detail. Construction costs will be estimated on the basis of preliminary <br />designs, information from available reports. the topographic and <br />geotechnical data developed by the BOR, unit costs developed from <br />telephone contacts with local contractors (limited to two). and <br />manufacturers quotations for mechanical features adjusted for <br />install.ation, A contingency of 25 percent of construction costs to account <br />for approximations in estimates and uncertainties in conditions will be <br />included, An amount equal to 20 percent of the sum of construction and <br />contingency costs for engineering and administration will be added to <br />these costs to estimate total capital costs, All costs will be calculated at <br />April 1988 levels to facilitate comparison with the work reported in the <br />Phase I . Final Report. No consideration of future inflation will be <br />included, <br /> <br />A total capital cost estimate for the selected reservoir enlargement and <br />intake canal size, <br /> <br />9 <br />