My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00422
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2011 10:10:00 AM
Creation date
10/5/2006 11:54:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153391
Contractor Name
Beeman Irrigation and Milling Company and Meadow Island Ditch Company No. 2
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 82-87
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER SIX <br /> <br />ESTIMATED COST <br /> <br />Prices taken from actual construction costs of small diversion dam in <br /> <br />this project which was rebuilt February 1,1980. <br /> <br />ITEM <br /> <br />QUANTITY UNIT PRICE TOTAL COST <br /> <br />1. Concrete, 4000 psi, reinforcement included <br />(Grade 60)(including labor) <br /> <br />2. Sheetpile, PZ38. (including installation) <br /> <br />225 C.Y. <br /> <br />$210 <br /> <br />$47,250.00 <br /> <br />4. Earth work, foundation and river diversion <br />structure <br /> <br />LUMP SUM <br /> <br />$11 .00 $83,600.00 <br /> $ 1,150.00 <br /> $132,000.00 <br /> $14,500.00 <br /> $ 6,500.00 <br /> $153,000.00 <br /> $22,950.00 <br /> $175,950.00 <br /> $21,114.00 <br /> $197,064.00 <br /> $19,706.00 <br /> $216,770.00 <br /> <br />7600 SF <br /> <br />3. Miscellaneous materials <br /> <br />Total Materials Cost <br /> <br />5. Engineering (including concrete testing) <br /> <br />Sub- T ota 1 <br /> <br />6. Contingencies at 15% <br />7. Project Total Cost 1980 Dollars <br /> <br />Escalation factor for 1981, 12% <br /> <br />8. Proj ec t Cos t 1981 <br />Escalation factor for 1982, 10% <br /> <br />9. Total Project Cost 1982 <br /> <br />Construction of this project will probably take 2 months. Payment of <br />contractors would be due 30 days after project completion. <br /> <br />Although this dam is designed to be maintenance free, some maintenance will <br /> <br />be required. Maintenance costs should be less than $100.00 a year. An emergency <br />operating fund of $500 will be set up to cover such things as replacement of <br />flashboards after large flood flows. For planning purposes it is expected that <br />this fund will be used once every 5 years. <br /> <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.