My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153606 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153606 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:20:26 AM
Creation date
10/5/2006 11:54:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153606
Contractor Name
Terrace Irrigation Company, The
Contract Type
Loan
Water District
21
County
Conejos
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... . ~.. <br />" <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />o <br /> <br />Department of Natural Resources <br /> <br />721 Slale Cenlennial BUlldmg <br />1313 Sherman Streel <br />Denver, Colorado B0203 <br />Phone{303)~3441 <br />FAX (303) 666-4474 <br /> <br />Roy Romer <br />Governor <br /> <br />September 24, 1993 <br /> <br /> - <br /> --' <br />011'1 <br />SC - <br />ASC <br />Fl 1\ <br />\ <br />L <br />oj l-li <br /> <br />Daries C.lile. P.E <br />Director. cwes <br /> <br />Mr. Felix D, Valdez, Esq. <br />500 Main Street <br />P,O, Box 62 <br />La Jara, CO 81140-0062 <br /> <br />Re: Terrace Irrigation Company - Alamosa Creek Canal Pr <br /> <br />Dear Mr. Valdez: <br /> <br />Enclosed please find signed copies of Change Orders Nos. 1-4 for the subject project, <br />which are hereby approved, The net results of the Change Orders will be to decrease the <br />construction contract amount by $47,146.89. This will be accomplished by deleting the 12- <br />mile Road Lateral (-$156,180.13) from this year's work, substituting instead work on several <br />other laterals in closer proximity to the Alamosa Creek Canal (+$109,033.24), giving a <br />revised contract amount of $799,839.06. <br /> <br />We understand that the remainder of the project, including the 12-mile Road Lateral <br />will be completed next year, via a separate 3rd Stage Construction Contract. A quick check <br />of the account balance indicates that, if the cost for work performed in 1993 stays as stated <br />above, approximately $311,000 will remain of the original authorization for work to be done <br />in 1994, <br /> <br />As always, if we may be of any assistance, please feel free to call. <br /> <br />Sinc>-~~. ..) _'.., <br />'--_ _ c::' //lti4 <br /> <br />Dennis G. Miller, P,E. <br />Senior Professional Engineer <br />Project Planning and <br />Construction Section <br /> <br />DGM/gI <br />Enclosures <br />cc: Royce Reinhardt, Terrace Irr. Co. <br />U.S. Soil Conservation Service, Alamosa <br /> <br />g10670.ltr <br />
The URL can be used to link to this page
Your browser does not support the video tag.