My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153707 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153707 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:47 AM
Creation date
10/5/2006 11:54:09 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153707
Contractor Name
Rainbow Park Water Company
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I- <br />I <br /> <br />Cost Estimate <br /> <br />The selected alternative is estimated to cost a total of $130,000. The planning and design <br />costs will be absorbed by the Natural Resources Conservation Service. The construction cost <br />estimate, including contingencies, was provided by the NRCS and is included in Appendix C. <br /> <br />Item Estimated Cost <br />1. Planning Costs $ (By NRCS) <br />2. Design Costs (By NRCS) <br />3. Construction Cost 114,000 <br />4. Contingency 16,000 <br /> ------------------ <br /> Total Costs $ 130,000 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implemerttation of the project: <br /> <br />Task <br /> <br />Target Completion Date <br /> <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br /> <br />Complete Final Design <br />NRCS Approves Design <br />Bid the Job <br />Award the Bid <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />1111195 <br />12/1/95 <br />1115/96 <br />2/09/96 <br />3/1/96 <br />6/1 /96 <br />6/1/96 <br /> <br />Feasibility of the Rehabilitation <br />of the Rainbow Park Ditch. <br />March 15, 1996 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.