Laserfiche WebLink
<br />I <br />I <br /> <br />C. <br /> <br />Scope of Work <br /> <br />I <br /> <br />The scope of work for the engineering services set forth in the <br />Contract is summarized as follows: <br /> <br />I <br /> <br />I <br /> <br />1. Determine the amount of surface water supplies from the <br />Crystal Creek. Black Mesa, local runoff, and return flow avail- <br />able for storage in the Gould Reservoir. The effect of routing <br />the present supplies of the Cattleman's Ditch Company through <br />storage at the Gould Reservoir on the overall water supply <br />situation in the project area is to be investigated. <br /> <br />I <br /> <br />I <br /> <br />2. Prepare feasibility-level designs of the storage, diversion <br /> <br /> <br />and conveyance structures, except that only reconnaissance-level <br /> <br /> <br />designs will be prepared for the proposed Black Mesa collection <br /> <br /> <br />conduit. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3. Briefly investigate water rights constraints that apply to <br />the project. <br /> <br />I <br /> <br />4. Perform operation studies of the system to provide the most <br /> <br /> <br />efficient and economic methods of utilizing available water to <br /> <br /> <br />meet the demands of the water users. <br /> <br />I <br /> <br />I <br /> <br />5. Briefly discuss the environmental considerations attendant to <br />the project. <br /> <br />I <br /> <br />6. Prepare project cost estimates at the feasibility study <br />level. <br /> <br />I <br /> <br />I <br /> <br />7. Evaluate the projected benefits and prepare the necessary <br /> <br /> <br />economic and financial analyses, including the repayment capacity <br /> <br /> <br />of the water users. <br /> <br />I <br />I <br /> <br />I <br /> <br />I-8 <br />