My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00411
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153491
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Loan
Water District
0
County
Routt
Bill Number
HB 83-1102
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />I - GENERAL INFORMATION <br /> <br />. <br /> <br />Location and project Description <br /> <br />The proposed Stagecoach Reservoir will be located on the <br /> <br />. <br /> <br />Yampa River in Routt County, Colorado approximately 17 1/2 miles <br /> <br />south of Steamboat Springs and 10 miles north and east of the Town <br /> <br />of Yampa. The location of the proposed Stagecoach Reservoir is <br /> <br />. <br /> <br />shown on Figure 1. <br /> <br />The Project is the result of many years of study by various <br /> <br />public and private entities. The numerous plans to utilize the <br /> <br />. <br /> <br />unique Stagecoach Darn site have sought to develop the Project to <br /> <br />varying degrees as a supply of water for irrigation, stock, domes- <br /> <br />tic, municipal, industrial and recreational uses with the emphasis <br /> <br />. <br /> <br />on the primary water uses changing with the ownership of the land <br /> <br />and water rights. <br /> <br />Stagecoach Reservoir (formerly Bear Reservoir) was originally <br /> <br />. <br /> <br />conceived as a part of the Upper Yampa Project proposed by the U.S. <br /> <br />Bureau of Reclamation during the 1950's and 1960's. The reservoir <br /> <br />. <br /> <br />was to be an 11,614 acre-foot supply of supplemental water for late <br /> <br />season irrigation of the lands under the proposed wessels Canal. <br /> <br />The Stagecoach Reservoir site and water rights were acquired in the <br /> <br />. <br /> <br />early 1970's by a group of land developers interested in the recre- <br /> <br />ational aspects of a larger Stagecoach Reservoir with a total <br /> <br />capacity of 33,719 acre-feet, the size of the current Project. The <br /> <br />.. <br />.. <br /> <br />J <br /> <br />I-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.