My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00406
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:24 AM
Creation date
10/5/2006 11:53:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0004X
Contractor Name
Green Mountain Exchange Project CWRDA
Contract Type
Loan
Water District
0
County
Grand
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-- - ----- --- ---- --- ---- --- ----- --- -..--- -- --------------------------~--~- <br /> <br />Future-Level Use <br />The two future level operating scenarios consisted of increasing the demands of certain <br />existing projects and adding presently undeveloped conditional projects to the Existing-Level Use <br />Scenario to produce target levels of water demand under projected moderate and high levels of <br />future development in the basin. The projects to be expanded and developed in the future and the <br />target levels of demand were established by the Authority in consultation with the DWB and the <br />CRWCD, Specific projects included in Moderate and High Future-Level Use Scenarios are as <br />follows: <br /> <br />,-. <br /> <br />-- <br /> <br />Moderate-Future Scenario <br />All of those projects under the Existing-Use Scenario were utilized plus: <br />o Homestake Project (Phase II) <br />o Ruedi Reservoir Marketing (partial use) <br />o Rock Creek Reservoir <br />o Indian Creek Reservoir <br /> <br />HiQh-Future Scenario <br />All of the projects included in the Existing-Use and Moderate Future-Use Scenarios <br />were utilized plus: <br /> <br />~ 0 Eagle-Arkansas <br /> 0 Continental-Hoosier <br />,......, 0 Pueblo/Eagle <br /> 0 Ruedi Reservoir Marketing (full use) <br /> 0 West Divide Project <br /> 0 Red Cliff Project <br /> 0 Oil Shale Projects (above that available from Ruedi and <br />,-. Green Mountain Reservoirs) <br /> <br />Although not specifically identified by individual towns or ski area, the high projected <br />demand of the Upper Fraser River, Upper Blue River, and the Eagle River areas were considered. It <br />was felt that Green Mountain water sales, Indian Creek Reservoir, and Rock Creek Reservoir would <br />accommodate the needs of these areas, It should be recognized that this Study was focused on the <br />entire basin and was not intended to cover site-specific water supply problems or demand <br />projections, <br /> <br />-, <br /> <br />3-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.