Laserfiche WebLink
<br />I <br />I'UTE <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />I If the letter and the documents have been misplaced, please <br />contact us and we II resubmit a duplicate set. <br /> <br />~. <br /> <br />E. LeRoy Black <br />I ELB:lml D:HD <br />Lonecabi.let <br />Enclosure ~ <br />I Copy to: Jim Briscoe v <br />Thomas A. Kelly- <br /> <br /> <br />I <br />I <br />I <br />I <br /> <br />i <br />, <br />, <br /> <br />ENGINEERING & SURVEYING <br />BQ.-X'674 .443 DODGE. DELTA. COLORADO. 81416 . <br /> <br />COMPANY <br />303-874-7593 <br /> <br />3384 <br /> <br />Decembe r 10, 1986 <br /> <br />Office of the State Engineer <br />Division of Water Resources <br />1313 Sherman Street - Room 818 <br />Denver, Colorado 80203 <br /> <br />Attenti on: <br /> <br />Jeris A. Danielson <br />State Engineer <br /> <br />Re: <br /> <br />Certified No. P122 143 230 <br />Date: November 7, 1986 <br />Lone Cabin Dam <br />W. Div. 4, DAMID: 400404 <br /> <br />Paragraph 4 of the above letter referenced the State Engineer's <br />letter dated January 2, 1986 and stated that the State Engineer's <br />office had not received a reply to that January 2 letter. That <br />comment is in error. Ute Engineering responded to the January 2, <br />1986 letter on July 17, 1986 and submitted specifications, blue- <br />prints and the mylar cover sheet. A copy of the July 17 letter <br />is enclosed. <br /> <br />