Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />3.03 <br /> <br />I <br /> <br />I <br /> <br />3.04 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3.05 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SECTION 03300 <br /> <br />in surface. Obtain a tolerance after curing of no more <br />than 1/8" in 10'. <br /> <br />FINISHING OF SLABS. <br /> <br />A. <br /> <br />Tamp concrete to force aggregate away from surface and screed. <br />Float surface and trowel lightly. <br /> <br />CURING AND PROTECTION. <br /> <br />Conform with ACI 605. protect concrete against rapid <br />drying. Keep moist for at least seven days after placing. <br />Concrete from which forms are removed within seven days, <br />as well as all cement finishes, shall be sprayed as fre- <br />quently as drying conditions may require. Use curing <br />compound acceptable to Engineer. No wheeling, working, or <br />walking on finished surface shall be allowed for 16 hours <br />after concrete is deposited. <br /> <br />COMPLETION. <br /> <br />Fill in holes and openings left in concrete for the pas- <br />sage of work of other trade? after their work is in place. <br />Mix, place, and cure to bl~nd with in-place construction. <br />Provide other miscellaneou? filling required to complete <br />work. <br /> <br />END OF SECTION <br /> <br />43 <br />