My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />3.03 <br /> <br />I <br /> <br />I <br /> <br />3.04 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3.05 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SECTION 03300 <br /> <br />in surface. Obtain a tolerance after curing of no more <br />than 1/8" in 10'. <br /> <br />FINISHING OF SLABS. <br /> <br />A. <br /> <br />Tamp concrete to force aggregate away from surface and screed. <br />Float surface and trowel lightly. <br /> <br />CURING AND PROTECTION. <br /> <br />Conform with ACI 605. protect concrete against rapid <br />drying. Keep moist for at least seven days after placing. <br />Concrete from which forms are removed within seven days, <br />as well as all cement finishes, shall be sprayed as fre- <br />quently as drying conditions may require. Use curing <br />compound acceptable to Engineer. No wheeling, working, or <br />walking on finished surface shall be allowed for 16 hours <br />after concrete is deposited. <br /> <br />COMPLETION. <br /> <br />Fill in holes and openings left in concrete for the pas- <br />sage of work of other trade? after their work is in place. <br />Mix, place, and cure to bl~nd with in-place construction. <br />Provide other miscellaneou? filling required to complete <br />work. <br /> <br />END OF SECTION <br /> <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.