Laserfiche WebLink
<br />I <br /> <br />SECTION 02219 <br /> <br />I <br /> <br />I <br /> <br />3.04 MEASUREMENT AND PAYMENT <br /> <br />I <br /> <br />A. Measurement, for payment will be made of the material in <br />place in the completed emb~nkment to the lines, grades, <br />slopes, and thicknesses shown on the drawings. No <br />allowance will be made in ~easuremerlt for payment for <br />settlement, shrinkage, and consolidation of the foundation <br />or of the material in the embankment. <br /> <br />I <br /> <br />B. Payment for earthfill in the embankbemt will be made at <br />the unit price per cubic yard bid therefore in the bid <br />schedule, which price shall include all costs of work <br />required under this section. <br /> <br />I <br /> <br />I <br /> <br />C. <br /> <br />No separate measurement or payment will be made for <br />sprinkler irrigation of the borrow pit. <br /> <br />I <br /> <br />D. <br /> <br />No separate measurement or payment will be made for <br />excavation and transporation of material. <br /> <br />I <br /> <br />END OF SECTION <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />40 <br />