My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />SECTION 02219 <br /> <br />I <br /> <br />within the area to be cove~ed by embankment, and which <br />extend below or beyond the established lines of excavation <br />for dam embankment foundations, shall be filled with <br />embankment materials and compacted as specified for the <br />overlying embankment. <br /> <br />I <br /> <br />I <br /> <br />C. The foundation for the earthfill, except surfaces of <br />formation materials, shall be prepared by leveling, <br />moistening, and rollin9 so that the surface materials of <br />the foundation will be as compact and will provide as <br />satisfactory a bonding surface with the first layer of the <br />earthfill as specified for the subsequent layers of the <br />earthfill. <br /> <br />I <br /> <br />I <br /> <br />D. Immediately prior to placing the first layer of earthfill, <br />all surfaces upon or against which the earthfill protions <br />of the dam embankment are to be placed shall be cleaned of <br />all loose and objectionable materials in an approved <br />manner by handwork, barring, picking, brooming, sluicing, <br />or by other effective means. Such surfaces shall have all <br />water removed from depressions and shall be properly <br />moistened and sufficiently clean to obtain a suitable bond <br />with the earthfill. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3.03 MOISTRUE AND DENSITY CONTROL <br /> <br />A. General <br /> <br />I <br /> <br />1. Each layer of the material on the embankment shall be <br />compacted by a minimum of 12 passes of the tamping roller <br />which shall be the minimum compacting effort to be <br />performed by the Contractor. During compaction, the <br />placement moisture content ~nd dry density of the <br />earthfill shall be maintain@d within the control limits <br />specified below. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />2. To determine that the moisture content and dry density <br />requirements of the compacted earthfill are being met, <br />field and laboratory tests will be made on samples taken <br />at embankment locations determined by the Engineer. Field <br />and laboratory tests will ~e made by the Engineer or his <br />agent. The results of all completed earthwork tests will <br />be available to the Contractor. Tests will be made at a <br />minimum of one per each day or part day of embankment <br />placement. Additional tests will be made by the Engineer <br />or his agent if conditions warrant. These conditions may <br />consist of contractor's con~truction methods, construction <br />inactivity, inclement weather or other conditions as <br />determined by the Engineer. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />3. Materials not meeting the specified moisture content <br />and dry density requirements, as determined by the tests, <br />shall be reworked until specified results are obtained. <br />Reworking may include removal, rehandling, reconditioning, <br />rerolling, or combinations of these procedures. The <br /> <br />I <br /> <br />I <br /> <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.