Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />SECTION 01700 <br /> <br />furnished by the contractor in 1.05 below. <br /> <br />F. <br /> <br />Construction will not be considered complete until the <br />Owner has received written approval by the State Engineer <br />of the as built drawings. <br /> <br />1.04 FINAL CLEANING <br /> <br />A. <br /> <br />Execute prior to final ,inspection. <br /> <br />B. <br /> <br />Remove waste and surplus materials, rubbish, and <br />construction facilities from the project and from the <br />si te. <br /> <br />1.05 PROJECT RECORD DOCUMENTS <br /> <br />A. Prepare as built drawings of each significant fitting. <br />Tie to permanent object for easy relocation. <br /> <br />B. Store documents separate from those used for construction. <br /> <br />C. Keep documents current, do not permanently conceal any <br />work until required information has been recorded. <br /> <br />D. At Contract closeout, submit documents with transmittal <br />letter containing date, project title, contractor's name <br />and address, list of documents, and signature of <br />contractor. <br /> <br />END OF SECT! ON <br /> <br />29 <br />