My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00402
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:24 AM
Creation date
10/5/2006 11:53:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153517
Contractor Name
Lone Cabin Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />SECTION 01010 <br /> <br />I <br /> <br />DIVISION 1 <br /> <br />I <br /> <br />SECT! ON 01040 <br /> <br />I <br /> <br />COORD I NAT! ON <br /> <br />1.01 <br /> <br />COOPERATION WITH OWNER <br /> <br />I <br /> <br />A. <br /> <br />Give work the constant attention necessary to facilitate <br />its prog~ess. Cooperate with Engineer. Maintain at site <br />a competent and reliable representative authorized to <br />receive orders and to initiate necessary actions. <br /> <br />I <br /> <br />1.02 COORDINATION <br /> <br />I <br /> <br />A. Be responsible for proper fitting and coordination of <br />operations of various subcontractors, trades, and <br />materialmen. <br /> <br />I <br /> <br />1.03 USE OF FACILITY <br /> <br />I <br /> <br />I <br /> <br />A. Owner shall have right at any time during construction to <br />enter same for the purpose of installing work covered <br />under a different contract. Contractor and Owner will, so <br />far as possible, work to the mutual advantage of both, <br />where their several works touch upon or interfere with <br />each other. <br /> <br />I <br /> <br />1.04 DIVISION OF SPECIFICATIONS <br /> <br />I <br /> <br />A. These specifications are arranged in several sections and <br />i nde}(ed for ease of reference. Such arrangement shall not <br />be considered, however, to define or limit the work of any <br />particular subcontractor,trade, or craft. <br /> <br />I <br /> <br />1.05 TEMPORARY SUSPENSION OF WORK <br /> <br />I <br /> <br />A. Engineer shall have authority to suspend the work wholly <br />or in part for such periods as he may deem necessary, due <br />to unsuitable weather or other conditions considered <br />unfavorable for suitable prosecution of work, or because <br />of failure of Contractor to perform any provisions of <br />contract. Immediately suspend work, in whole or in part, <br />upon receipt of a written order from Engineer. Resume <br />work as ordered by Engineer. Do not suspend work without <br />written authority of Engineer. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />END OF SECT! ON <br /> <br />I <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.