My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00401
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 9:24:42 AM
Creation date
10/5/2006 11:53:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153025
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Grant
Water District
0
County
Routt
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' <br />' <br />, <br />1 <br />' <br />that it would be ai`ected by a"comnact call". This fact couoled <br />caith it's large lona term hold-over storage capability would provide <br />a high degree of protection for any junior decree which was tied <br />into the ,7uniner development. It �aould be the intent o` the Colorado <br />River District and the Upper Yamoa District to unitize the various <br />water rights and develooMents in the Yampa Valley in such a way <br />as to riaximize reliability benefits to all. Thus each would tend <br />to enhance and complement the value of the other rather than one <br />detracting from the other. <br />' In the event that Yamcolo Reservoir is constructed and plans <br />for construction of Juniper are not im�lemented, it is orobable that <br />, legal aqreements could be worked out which would subordinate either <br />a Dortion of the Juniper degree or other senior decrees in the basin <br />, to Yar.tcolo to the extent necessary to provide protection from a <br />"comnact call". <br />' SwN.^,ary o� P7ater P.eauirements <br />Table 15 summar_izes the nrojected needs and allocations <br />' from Yamcolo P.eservoir as identified in preceeding sections of <br />this chapter. <br />' <br />' <br />1 <br />' <br />TABLE 15 <br />Summarv of Ptater rleeds and Allocations <br />Projected <br />Need <br />Use AF/Year <br />Irrigation 6,800 <br />Municinal and Domestic 1,000 <br />Industrial <br />TOTAL <br />5,000 <br />12,800 <br />Proposed <br />Allocation <br />A'?/Year <br />3.,000 <br />1,000 * <br />4,000 <br />8,000 <br />* This is raw untreated water. <br />' It is evident from a comparison of orojected needs within <br />the project area with the supply which will be developed at <br />' Yamcolo, that all needs will not be satisfied as a result of <br />this project. However, it will represent a big first step <br />C <br />IV-15 <br />1 <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.