Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.0 PREVIOUS STUDIES <br /> <br />The following is a chronological list of reports from previous investigations <br />which pertain to this feasibility study: <br /> <br />o En9i neeri ng Report on Rehabil i tati On of Barnes Meadow and Peterson <br />Reservoi rs, Larimer County, Colorado; Nel son, Haley, Patterson, and <br />Qui rk, Inc.; December, 1968. <br /> <br />o Phase 1 Inspection Report, National Dam Safety Program - Barnes <br />Meadow, Larimer County, Colorado; U.S. Army Corps of Engineers, Omaha <br />District; August 8, 1978. <br /> <br />o Engineering Report in Compliance with Colorado Revised Statutes, <br />1973, 37-87-123, Barnes Meadow Dam, Larimer County, Water Division 1, <br />Water District 3; October 28, 1983. <br /> <br />o Draft Report on Radar Survey of Barnes Meadow Dam and Appurtenances; <br />Davenport/Hadley, Ltd.; May 1986. <br /> <br />o Outlet Works Investigation, Barnes Meadow Dam, Phase 1 Report; Warzyn <br />Engineering Inc., Madison, Wisconsin; June 1986. <br /> <br />o Outlet Works Investigation, Barnes Meadow Dam, Phase 2 Report; Warzyn <br />Engineerin9 Inc., Madison, Wisconsin; August 1986. <br /> <br />Each of these reports was reviewed to ~upplement the information gathered for <br />this investigation. Additional data was obtained from the working files of <br />the City and the SEO. <br /> <br />1231 H <br /> <br />-7~ <br />