My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00399
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153034
Contractor Name
Hayden, Town of
Contract Type
Grant
Water District
0
County
Routt
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />. <br /> <br />d ~ 5 i g n for the f eat.5 w h i c h will be r e qui red.. e s i 0 n wi 1 1 be car r i e d <br />to the point where adequate cost analyses can be made. <br /> <br />7. Chaoter 6 Estimated Costs <br /> <br />The various alternates presented in the previous chapters <br /> <br />will be presented based on cost estimates, and the most econoMical <br /> <br />solution to the water supply oroblem will be presented. Such cost <br /> <br />estimates will of course include a discussion of contingency funds, <br /> <br />future cost escalations, interest to be charged durinq construction, <br /> <br />engineering, legal and any other administrative charges that may <br /> <br />properly be made against the project. <br /> <br />For this selected project a <br /> <br />detailed annual fund requirement vlill be set up vlhich vJill also in- <br /> <br />clude operation maintenance and replacement cost and an emergency <br /> <br />operating fund. <br /> <br />8. ChapterL!roject Evaluation <br />This paragraph will explore the capacity of the town to <br />repay the expected cost of the project and will set forth a prooosed <br />schedule of water rates to be charged for the sale of M & I water. <br />9. Chapter 8 Financial Proqram <br />This section will demonstrate financial feasibility of the <br /> <br />proposal including all the estimated costs not only of construction but <br /> <br />of operations, maintenance, replacement and emergency operating fund. <br /> <br />It will then demonstrate the water rates to be charged by the town <br />and the ability of the town to pay off the project in its entirety <br /> <br />within the time limit set. Since this is a single purpose project <br /> <br />the other. cost allocation features and feaSibility requirements as <br /> <br />suggested in the guidelines will not be necessary. <br /> <br />An estimate of the detailed cost.analyses for preparing the <br /> <br />feasibility report is appended here to show the cost breakdown of <br />engineering, technician, secretarial time that is estimated to complete <br /> <br />the report. <br /> <br />.--..:-.-~ <br /> <br />.. ..... ~,..,~.-n-.'.T-:;,~::,~.v~TT-".__ - <br />
The URL can be used to link to this page
Your browser does not support the video tag.