My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00399
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:53:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153034
Contractor Name
Hayden, Town of
Contract Type
Grant
Water District
0
County
Routt
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />. <br /> <br />incorporated, the contracting powers of the town, its financial status <br /> <br />and the various facilities and physical features of the town. <br /> <br />4. Chapter 3 Land <br /> <br />A brief chapter will be included in evaluating the soils <br /> <br />and land conditions in and around the town of Hayden, in the areas <br /> <br />. <br /> <br />which have been' or may be proposed for annexation as the town grows. <br />Since this is for a municipal project no land classification concern- <br />ing the agricultural capabilities of lands will be included. The <br /> <br />maps suggested for this section will utilize the project map as <br /> <br />suggested in Chapter 2 which will show the boundaries of the town <br /> <br />and the areas to be served. <br /> <br />5. Chapter 4 Water <br /> <br />The water requirements of the town will be extensively <br />review:J Population proj~ctions as developed by the Northwest Area <br />Council of Governments and the Routt County Regional Planning <br /> <br />Commission as well as the future water requirements. Additionally <br />this section will review past records for water quantity and quality <br /> <br />and show the projections for water requirements for the future. In- <br /> <br />eluded also will be a discussion of water rights and the amount of <br />supply avaiiable. <br />6. Chapter 5 Plan of Development <br />This paragraph will thoroughly investigate the facilities <br /> <br />of the town water supply and will demonstrate the necessity for im- <br /> <br />provements. The report will also show alternate methods of supply and <br /> <br />treatment for the town. Based on cost-effective techniques the report <br /> <br />will present what is considered to be the best plan for providing <br /> <br />adequate water supply for the town. Included also will be a brief <br />explanation of any geological hazards or any geological features that <br /> <br />may require additional study and will present in outline form basic <br /> <br />-'~~~~'.:'-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.