Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />,,\ <br /> <br />Table 1. Cost Summaries for Feasibility Study <br /> <br />", <br /> <br />Red Mesa Ward Reservoir Enlargement <br /> .u.. ~.,_ ,,__ _ <br />Directive Final Feasibility <br />Geological/Geotechnical & Topography $21,183 <br />Hydraulics & Hydroelectric $24,738 <br />Institutional Issues $15,518. <br />Hydrology & Water Quality $8.791 <br />Institutional Constraints $27.131 <br />Evaluation & Reporting $37,755 <br />I Project Total $135,114 <br /> <br />Long Hollow Dam & Reservoir <br />Directive Phase I - Initial Feasibility Phase II - Final <br /> (Fatal Flaw) Analysis Feasbility <br />Geological/Geotechnical & Topography $33,502 $35,529 <br />Hydraulics & Hydroelectric -- $31 ,336 <br />Institutional Issues $56,733 -- <br />Groundwater Hydrology & Water Quality $65,933 -- <br />Institutional Constraints $45.710 -- <br />Evaluation & Reports - $15,464 $25.338 <br /> Subtotal $217,342 $92.202 <br />Project Total $309,544 <br /> <br />Study Total = <br /> <br />$444,658 <br /> <br />F:/Spreadsheets/wwe <br />12002/991-077/060/Large Grant <br />Workplan\Table 1 Cost Summaries <br /> <br />WRIGHT WATER ENGINEERS, INC. <br /> <br />Des. By: CRUTB <br />Ckd BY: DJ/EAB <br />