Laserfiche WebLink
<br />. <br /> <br />TABLE 11 <br /> <br />ALTERNATE A <br />OUTLET WORKS REPAIR AND DAM MONITORING PROGRAM <br /> <br />OPINION OF PROBABLE CONSTRUCTION COST <br /> <br /> Description Units Total Cost <br /> Outlet Works Tunnel <br /> Care of Water Lump Sum $ 45,000 <br /> Gate Repa i rs Lump Sum 100,000 ~ <br /> Acces s Road to Dam Toe Lump Sum 25,000 <br /> North Abutment Monitoring Program Lump Sum 30,000 <br /> Flood Warning Program Lump Sum 50,000 <br /> Subtota I $ 250,000 <br />. Engineering (5%) 13,000 <br /> Con t i ngenc i es (25%) 62,000 <br /> Subtota I $ 325,000 <br /> Cost Escalation to 1982 (10"10) 32,000 <br /> TOTAL $ 357,000 <br /> Round to $ 360,000 <br /> <br />Annual operating cost for dam and north abutment monitoring program <br />would be $10,000. <br /> <br />. <br /> <br />-50- <br />