Laserfiche WebLink
<br />:1 <br />I. <br />II <br />I <br />II <br />I. <br />I <br />II <br />I. <br /> <br />i, <br /> <br />'. <br />I <br />I <br />. <br />. <br />. <br />. <br />I <br />I <br />I <br />. <br />I <br /> <br />CACHE LAPOUDRE RESERVOIR DAMS <br />REPAIR ALTE~~ATE NO. 1 <br /> <br />Item <br /> <br />Estimated <br />Cost <br /> <br />1. <br /> <br />REPAIR TO DAM NO.2. <br />(West Dam) <br /> <br />.. .. . .. . .. . .. .. . <br /> <br />. $231,950 <br /> <br />Breakdown <br /> <br />A. Riprap 6500 Tons New @ $10.00 <br />Riprap 5500 Tons Existing @ $.85 <br /> <br />B. Riprap Filter 5500 Yds. @ $4.00 <br /> <br />C. Earth Fill <br />Impervious (Clay) 58000 yds. @ $.95 <br />Pervious (Sand & Gravel) 21000 yds. @ $.80 <br /> <br />D. Excavation <br />Unclassified 39500 yds. @ $.75 <br /> <br />E.Finishing, Grading, Seeding, L.S. $5000.00 <br />Tree Removal, Etc. <br /> <br />F. Drainage Ditch Encasement 1800 ft. @ $5.00 <br /> <br />G. Toe Drains 2750 ft. @ $9.00, <br /> <br />2. <br /> <br />REPAIR TO DAM NO.1. . <br />(South Dam) <br /> <br />. . . . . . $ 319,325 <br /> <br />Breakdown <br /> <br />A. Riprap 8500 Tons New @ $10.00 <br />Riprap 7500 Tons Existing @ $.85 <br /> <br />B. Riprap Filter 9700 yds. @ $4.00 <br /> <br />C. Earth Fill <br />Impervious (Clay) 62000 yds. @ $.95 <br />Pervious (Sand & Gravel) 35000 yds. @ $.80 <br /> <br />D. Excavation <br />Unclassified 69000 yds. @ $.75 <br /> <br />E. Finishing, Grading, Seeding, L.S. $6500.00 <br />Tree Removal <br /> <br />F. Drainage Ditch Encasement 950 ft. @ $5.00 <br />G. Toe Drains 3150 ft. @ $9.00 <br />H. Lake Canal Relocation 8000 yds. @ $.90 <br />I. Relief Drains 850 ft. @ $12.00 <br />