Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />, <br /> <br />5. <br /> <br />Diversion dam and gaging <br />station @ 36th Lane 136,000 <br /> <br />e <br /> <br />6. <br />7. <br /> <br />Hard point 8,000 <br />Pump stations and pipe lines <br />Total <br />projects completed to date <br />Balance <br /> <br />(Completed) <br />180.000 <br />$710,000 <br />253.000 <br />457,000 <br /> <br />IMPLEMENTATION SCHEDULE <br /> <br />1- Complete final design <br />2. Bid the job <br />3. Award the job <br />5. Start construction <br />6. Complete construction <br />7. Project is operational <br /> <br />Task completion dates <br />Phase 1 Phase 2 <br />10-1-1996 2-1-1997 <br />11.-1-1996 6-1-1997 <br />11.-10-1996 6-15-1997 <br />11.-20-1996 7-1-1997 <br />3-15-1997 3-30-1998 <br />3-16-1997 4-1-1998 e <br /> <br />Task <br /> <br />SOCIAL, ECONOMIC AND PHYSICAL IMPACTS <br /> <br />The project will have no significant social impacts. <br /> <br />The project will have a positive economic impact associated <br />with assuring a'water supply for historically irrigated land and <br />maintaining this land in a produotive capacity. This will provide <br />jobs and crops that will be used for feeding livestock in the <br />valley or will be shipped out to bring in outside money to <br />stabilize the local economy. <br /> <br />The project will have no physical impacts, once construction <br />is complete. Other than the reCharge basins, the balance of the <br />project will be below the ground level and not noticeable to the <br />general public. <br /> <br />.. : <br /> <br />PERMITTING <br /> <br />There are no wetlands alons the ditch right <br />ditch will all be on private property except for <br />Highway 96, for which the bridge is already in. <br /> <br />No EA or EIS will be required. <br /> <br />of way and the <br />one crossing of <br /> <br />e <br /> <br />r <br />