My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153748 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153748 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 11:10:14 AM
Creation date
10/5/2006 11:52:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153748
Contractor Name
Excelsior Irrigating Company
Contract Type
Loan
Water District
14
County
Pueblo
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />, <br /> <br />., <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />. <br /> <br />. <br /> <br />is at a lower stage, a sand dam will be pushed over the concrete <br />blocks in order to get water. In the spring this sand will be <br />washed down the river but this arrangement will allow water to be <br />diverted at a minimum cost. In addition, a hard point will be <br />constructed at a point above the dam to direct the river into the <br />main channel and away from the north side of the river where the <br />ditch intake is located. <br /> <br />The ditch will be cleaned from the headgate to where it <br />crosses Highway 96, a distance of some 6 1/2 miles. The grade of <br />the ditch has been established by the Natural Resources <br />Conservation Service (SCS). <br /> <br />Two wasteway structures will need to be extensively repaired <br />and two county road crossing culverts will have to be installed. <br />To facilitate the recharge of the aquifer under the irrigated land, <br />-recharge ponds will be incorporated into the ditch. <br /> <br />A pre-fabricated ditch intake structure has already been <br />installed as a temporary structure for 1996. A more permanent <br />structure will be installed during the 1996-97 winter storage <br />season. <br /> <br />COST ESTIMATE <br /> <br />The selected alternative is estimated to cost a total of <br />$ 710,000. Planning costs will be absorbed by the sponsor. Design <br />will be by the company engineer and NRCS (SCS). The construction <br />cost estimate, including contingencies, is provided by the company <br />engineer. <br /> <br />A concrete and rock hard point will be installed upstream of <br />the diversion dam in order to keep the river from going around the <br />north end of the dam during high water. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Phase 1 <br /> <br />Phase 2 <br /> <br />1. Planning costs <br /> <br />$1,500 <br /> <br />$1,500 <br /> <br />2. Design costs <br /> <br />3,000 <br /> <br />3,000 <br /> <br />3. <br /> <br />Excavating Excelsior Ditch <br />Culverts cost <br />CUlvert installation <br /> <br />.. : <br />237,000 (Completed) <br /> <br />4. Dirt work, recharge and <br />pump station ponds (9) <br /> <br />8,000 <br />(Completed) <br /> <br />150,000 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.