Laserfiche WebLink
<br />. <br /> <br />, <br /> <br />12. Evaluate alternative improvement plans to alleviate the existing <br />and potential problems identified in item 11 above, determine their <br />cost, and select one alternative for implementation. <br /> <br />I <br />, <br />, <br /> <br />13. Conduct a detailed engineering and economic feasibility of the <br />selected alternative improvement plan. <br /> <br />"14. Develop a financial program that will demonstrate the financial <br />feasibility of the proposed facilities. <br /> <br />15. Prepare and print a report according to the requirements of the <br />Colorado Water Conservation Board. <br /> <br />, <br /> <br />ENGINEERING FEES <br /> <br />. <br />. <br /> <br />J <br /> <br />The estimated fees presented below are based on the man-hour require- <br />ments and the current charges for the proposed services. We believe that the <br />uverall level of effort is realistic for the scope of services required. <br /> <br />Should the final scope of <br />I:h.i.s proposal, lUe ,vollld adjust <br />accordingly. <br /> <br />services be different than that outlined in <br />the le:vcl of effort and the associated fees <br /> <br />Work Task" <br /> <br />Enqineerinq Fr'" ($) <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br /> <br />880 <br />400 <br />860 <br />460 <br />2740 <br />870 <br />620 <br />620 <br />1230 <br /> <br />1850 <br /> <br />lOGO <br />1890 <br />1230 <br /> <br />CONTINUEI}-- <br />