My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00382
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2010 10:57:00 AM
Creation date
10/5/2006 11:52:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153685
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MAR-30-93 TUE 14:58 <br /> <br />. <br /> <br />ft-J /-5' <br /> <br />. <br /> <br />PHYSICAL IMPROVEMENTS COST ESTIMATE WORKSHEET <br />(Required for projects Involving structures and !acUities other <br />lhan slngle-famuy housing units) <br /> <br />SOURCE OF ESTIMATE: Town Manaqer, Halepaska <br /> <br />Act. <br />No. <br /> <br />Description <br /> <br />Redrill well (approximately 60'-65' <br />away fran existing well) which went <br />d= July 1992. <br /> <br />I Grant preparation (in kind) <br /> <br />II <br /> <br />Review plans, schedulin~ monitoring, <br />financial tracking for II, III,IV,& V. <br /> <br />Pull well, purrp, & other material <br /> <br />Fill well <br /> <br />III Prepare and sul:mit well pennit <br />application (Engineering <br /> <br />Prepare contract documents & technical <br />specifications (Eng.) <br /> <br />Put well #2 out for bid & evaluate <br />bids (Eng.) <br /> <br />Drill & gravel pack well <br />Observe drilling & well construction (E ,g.) <br /> <br />Install pipe, purrp & set motor <br /> <br />Bring power to site <br /> <br />Miscellaneous wire <br /> <br />Observe well developrrent, pump, test & <br />collect water sample (Eng.) <br /> <br />IV Update existing wellhouse <br /> <br />V Run pipe from wellhead to wellhouse <br />(60'-65') <br /> <br />Prepare final report (Eng.) <br />I TOTAL <br /> <br />P.o? <br /> <br />/ <br /> <br />DATE OF ESTIMAtE: 3/1/93 & 10/30/92 <br /> <br />No. 01 Units <br />or$ize <br /> <br />Untt <br />Price <br /> <br />TOIal <br />Co$! <br /> <br /> 245.5 0 <br /> 1,273.5 0 <br /> 1,200 <br /> 3,500 <br /> 200 <br /> 500 <br /> 500 <br /> 100,000 <br /> 8,300 <br /> 14,000 <br /> 10,000 <br /> 5,000 <br /> 1,000 <br /> 1,500 <br /> 300 <br /> 1,500 <br />, $149,019 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.