My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00382
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2010 10:57:00 AM
Creation date
10/5/2006 11:52:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153685
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />BCJ&,IU= <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. Topographic Survey and Surface Inspection. A survey was completed for the <br /> <br />project site including the embankment and spillway. A dam inspection was <br /> <br />performed to include the reservoir, embankment, spillway, and outlet works. <br /> <br />3. Geotechnical and Geologic Investigation. Subsurface exploration and <br />laboratory testing of the embankn1ent dam and foundations, and preliminary <br />geotechnical evaluations of the stability and seepage of the embankment were <br />performed. <br /> <br />4. Hydrologic Analysis. The IOO-year and the general and local probable maximum <br /> <br /> <br />flood events were computed for the project, which were used to the perform <br /> <br /> <br />hydrologic reservoir routings and to determine the hazard classification of the <br /> <br /> <br />dam. <br /> <br />5. Dam Hazard Classification. The dam is presently classified as a Class II dam. <br />The hazard classification was verified based on SEO guidelines. The hazard <br />classification of the dam will dictate the SEO required dam modifications. <br /> <br />6. Hydrologic Routing. The hydrologic routing for the dam was performed to <br /> <br /> <br />determine the impacts of the flood hydrology on the existing and proposed dam <br /> <br /> <br />configurations. <br /> <br />7. Alternative Development. Several alternatives were developed in an attempt to <br /> <br /> <br />identify the least costly combination of measures for achieving the project <br /> <br /> <br />objectives. <br /> <br />8. Study Report. A report was prepared to formalize the results and <br /> <br /> <br />recommendations of all tasks performed for the study. <br /> <br />9. Monument Lake Chronologicalliistory. The history of the lake and dam were <br />developed from existing records from the County, Town, and SEO. <br /> <br />Monument Lake Dam Feasibility Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.