My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00382
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2010 10:57:00 AM
Creation date
10/5/2006 11:52:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153685
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Monument Lake Darn Feasibility Study <br /> <br />. <br />IV <br /> <br />1f30VLE.': <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. Replacing the existing twin 16-inch <luctile iron pipe outlet works with a 24-inch <br />cement mortar lined steel pipe encast:d in concrete controlled with an upstream 24- <br />inch by 24-inch sluice gate. <br /> <br />3. Reinforcing the existing spillway walls with concrete and constructing a uniform <br /> <br /> <br />grouted riprap drop-step discharge Chute with reinforced concrete training walls. <br /> <br />4. Dredging the reservoir to regain resetvoir storage. <br /> <br />Total capital expenses for the recommended alternatives, including construction and <br />construction management services with 20 perct:nt contingency, and design engineering, is <br />$3,086,000 (rounded). The County will pay up (0 $1,000,000 of the total project capital <br />expenses. The Town will then pay the balance ()f the total project capital expenses plus the cost <br />of this study, which is equal to $ 2,086,000 (roul1ded). The Town will apply for 100 percent of <br />their portion of the project cost through the CWtB Construction Fund loan program. <br />Construction will begin in September 2001 with completion by April 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.