Laserfiche WebLink
<br />Monument Lake Dam Feasibility Study <br /> <br />11 <br /> <br />.- <br />ElCJ'r'LE.~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Acknowledgments <br /> <br />Boyle Engineering Corporation would like to thank the Town of Monument for their <br />valuable assistance during the preparation of this report. Special thanks are offered to Messrs. <br />Rick Sonnenburg, Leon Tenney, and Ms. Betty Konarski, Town of Monument; Mr. Garrett <br />Jackson, State Engineer's Office (SEa); Mr. Robert Krassa, Krassa, Madsen & Miller, LLC; Mr. <br />Roger Sams, GMS Consulting Engineers; and Mr. Bill Green, Colorado Water Conservation <br />Board (CWCB) for their time and efforts on this project. ' " <br />. ) <br /> <br />The following lists Boyle's team members for the project: <br /> <br />. <br /> <br />Mr. Ed A. Toms, P.E. <br /> <br />Project Ma.nager/ <br />Principal Designer <br /> <br />. 1 <br />'., ...' ~ <br />. ~...~\~. . j.....,... ~ <br />.... ,_ ,_.....'r... <br />...., . ...~.. <br />"1 '"\' ..z,-' <br />1.'\, <br /> <br />Mr. Blaine Dwyer, P.E. <br /> <br />Principal-in-Charge <br /> <br />Mr. David Blanchette, P.E. <br /> <br />Structural Engineer <br /> <br />Mr. Richard Pearce, E.I.T. <br /> <br />Civil/Hydraulic Engineer <br /> <br />Mr. Kit Choi, PhD., P.E. <br /> <br />BasePoint Design Corporation <br />Geotechnical Services <br /> <br />Mr. John Lambert, PLS <br /> <br />Sellards & Grigg, Inc. <br />Surveying Services <br />