My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00378
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:48:29 PM
Creation date
10/5/2006 11:52:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153790
Contractor Name
Durkee Ditch Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />for a 12 CFS flow. The design will incorporate flush boxes to <br />clean the line and to direct side drainage flow past the pipe. A <br />concrete outlet box will be installed at the end of the new <br />pipeline to transition back to the existing ditch. <br /> <br />The NRCS Trip Report, including a discussion of preliminary <br />design issues, is included in Appendix B. <br /> <br />Water Rights <br /> <br />I <br /> <br />The Durkee Ditch was constructed starting July 8, 1895, and has a <br />Statement of Claim of Water Right dated October 1895, The amount <br />of water claimed is 8 CFS, and there are a total of 500 shares in <br />the DDC. The State Engineer Diversion Records for 1994 and 1995 <br />indicate total diversions for each year of 1814 acre-feet and <br />1695 acre-feet respectively. See Appendix D. <br /> <br />I <br /> <br />Cost Estimate <br /> <br />I <br />I <br />I <br />I <br /> <br />The estimated total project cost for the selected project is <br />$112,000. Project planning and engineering design will be <br />provided by the Natural Resources Conservation Service (NRCS) <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs by NRCS <br />2, Construction Cost with Contingency <br /> <br />$ 0 <br />$112.000 <br /> <br />Total Cost <br /> <br />$112,000 <br /> <br />The NRCS cost estimate for Alternative #2, and the cost estimate <br />for Alternative #3, are included in Appendix B. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br /> <br />Tarqet <br />Completion Date <br /> <br />1. Complete Final Design <br />2, NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />07/01/97 <br />08/01/97 <br />09/08/97 <br />11/08/97 <br />12/01/97 <br /> <br />Feasibility Study <br />Rehabilitation of the Durkee Ditch <br />September 1997 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.