My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00378
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:48:29 PM
Creation date
10/5/2006 11:52:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153790
Contractor Name
Durkee Ditch Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br /> <br />Alternatives Evaluated <br /> <br />A range of alternatives were considered including 1) don't build <br />the project, 2) rehabilitate the diversion structures and place <br />13,000 feet of the ditch in pipeline, and 3) rehabilitate the <br />diversion structure on current creek and place 2,000 feet of the <br />ditch in pipeline. <br /> <br />A subjective evaluation of the alternatives follows: <br /> <br />1, Don't build the prolect: <br /> <br />I <br /> <br />No action taken to solve this problem will leave the <br />shareholders short of water and dealing with the high <br />maintenance costs associated with a deteriorated ditch <br />system. This alternative is feasible, but is not considered <br />acceptable by the shareholders. <br /> <br />I <br />I <br />I <br /> <br />2. Rehabilitate the diversion structures and place 13.000 <br />feet of the ditch in pipeline: <br /> <br />I <br /> <br />The deteriorated diversion structures at the head of the <br />ditch would be replaced, and the ditch would be placed in a <br />plastic pipeline. The pipeline would tie into the 36" CMP <br />on the side hill of Redlands Mesa. This option would cost <br />about $350,000 and would solve the seepage problem along the <br />upper end of the ditch, and in the unstable area along <br />Redlands Mesa. This alternative is feasible, but is not <br />preferred by the shareholders due to cost. <br /> <br />I <br /> <br />3, Rehabilitate the diversion structure on current creek <br />and place 2.000 feet of the ditch in pipeline: <br /> <br />I <br /> <br />The deteriorated diversion structure on current creek at the <br />head of the ditch would be replaced, and the ditch would be <br />placed in a plastic pipeline which would extend 2000 feet <br />down the ditch. This option would solve the seepage <br />problems only on the upper end of the system, but would be a <br />good starting project toward total rehabilitation of the <br />ditch. The cost would be about $112,000. This alternative <br />is feasible, and is preferred by the shareholders, <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />The Natural Resources Conservation Service (NRCS) has provided <br />technical engineering assistance in the evaluation of the above <br />alternatives. <br /> <br />The Selected Project <br /> <br />The DDC has decided to replace the diversion on Currant Creek, <br />and to place 2000 feet of ditch in a 36" plastic pipeline rated <br /> <br />Feasibility Study <br />Rehabilitation of the Durkee Ditch <br />September 1997 <br /> <br />5 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.