My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153804 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153804 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2011 3:26:42 PM
Creation date
10/5/2006 11:51:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153804
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LEFT IIAND DITCH COMPANY <br /> <br />RESOLUTION <br /> <br />A RESOLUTION REQUESTING STATE CONSTRUCTION FUNDING THROUGH THE <br />COLORADO WATER CONSERVATION BOARD FOR ENLARGEMENT OF THE SPILLWAY <br />CAPACITY AT LEFT HAND VALLEY RESERVOIR. <br /> <br />'Whereas, the Office of the State Engineer has ordered an <br />increase in the capacity of the spillway at Left Hand Valley <br />Reservoir to increase the public safety; and <br /> <br />Whereas, the Left Hand Ditch Company seeks to obtain the <br />most favorable financing of the project; and <br /> <br />Whereas, according to section 4 of Article VII of the By- <br />Laws/Articles of Incorporation of the Left Hand Ditch Company the <br />Board of Directors shall have the power "to borrow money on the <br />credit and responsibility of the Corporation, in such sums as <br />they may deem necessary or proper for all purposes previously <br />authorized by the stockholders of the Corporation"; and <br /> <br />Whereas, at the annual meeting of the stockholders of the <br />Left Hand Ditch Company held February 5, 1994 said stockholders <br />approved a motion authorizing the Board of Directors to take such <br />action as may be necessary to comply with the office of the State <br />Engineer's order to increase the spillway capacity of the Left <br />Hand Valley Reservoir including construction of an additional <br />spillway of roller compacted concrete and to approve and obtain <br />loans and/or other financing means necessary to finance the <br />project; <br /> <br />NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF <br />THE LEFT HAND DITCH COMPANY: <br /> <br />1. That the total estimated construction cost for <br />increasing the spillway capacity at Left Hand Valley Reservoir <br />including the actual construction and construction engineering is <br />$490,400. <br /> <br />2. That the Left Hand Ditch Company is applying to the <br />Colorado Water Conservation Board for $367,800.00 in State <br />construction loan funds to partially finance this project, said <br />funds to be repaid over a period of 30 years. <br /> <br />3. <br />remaining <br />period of <br /> <br />That the Left Hand Ditch Company proposes to borrow the <br />$122,600.00 through a bank loan to be repaid over a <br />15 years. <br /> <br />P.Q, Box 229 . Niwot. Colorado . 80544 . (303) 530-0125 . Fa.'( (303) 530-5252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.