My WebLink
|
Help
|
About
|
Sign Out
Search
C153804 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153804 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2011 3:26:42 PM
Creation date
10/5/2006 11:51:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153804
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LEFT HAND DITCH COl\'IPANY <br /> <br />August 31, 1994 <br /> <br />Mr. Chuck Lile, Director <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />Re: Feasibility Study for Increasing the Spillway capacity at <br />Left Hand Valley Reservoir, Boulder County, Colorado <br /> <br />Dear Mr. Lile: <br /> <br />The Office of the State Engineer has ordered the Left Hand Ditch <br />Company to increase the spillway capacity at Left Hand Valley <br />Reservoir or to face a storage restriction. The attached <br />feasibility study concludes that the most feasible way of <br />accomplishing the increase is to construct an additional spillway <br />of roller compacted concrete over the north dam. The Left Hand <br />Ditch Company is seeking financial assistance from the Colorado <br />Water Conservation Board to pay for the work required in this <br />project. The Company will acquire additional funding through its <br />bank for the amount not financed by the CWCB. <br /> <br />Transmitted herewith is a feasibility study which provides <br />information about the project and the Left Hand Ditch Company in <br />accordance with the CWCB guidelines. The construction cost of <br />the project is estimated to be $490,400. A completed loan <br />application has already been transmitted to your office <br />requesting approval of up to $500,000 for financing of this <br />project. If you have any questions related to this feasibility <br />study please contact Mr. Mark McLean of Rocky Mountain <br />Consultants, Inc. at (303) 665-6283. <br /> <br />Thank you for your consideration. <br /> <br />Sincerely, <br /> <br />LEFT HAND DITCH COMPANY <br />/ <br />'-.,t.-- <br />.A - 'v b.i;J..,...--,..-?'!""' <br />/- ' K-~:-' f.,r ;/ " <br />~harles Lippincott, Vice - President <br /> <br />Attachment <br /> <br />P.O. Box 229 . Niwo[. Colorado . 80544 . (303) 530-0125 . Fax (303) 530-5252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.