My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00376
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:23 AM
Creation date
10/5/2006 11:51:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153364
Contractor Name
Beck, R. W. and Associates
Water District
0
County
Garfield
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(- <br /> <br />. <br /> <br />f. Conduct a limited materials testing program, consisting <br />of primary soils tests and selected secondary testing. <br /> <br />g. Review regional geology, seismicity and fault locations <br />and interpret aerial photographs with respect to <br />regional features such as lineaments, faulting, etc. <br />Conduct preliminary seismic hazard evaluation <br />investigations if necessary. <br /> <br />h. Evaluate foundation conditions and required treatment. <br /> <br />i. Prepare and submit to the State a report on the results <br />of site inspections and geotechnical investigations. <br />Coring drilling shall not be permitted unles5 approved <br />in advance by the State. <br /> <br />Task 6 - Surveys <br /> <br />data. <br /> <br />This work task shall be conducted to supplement existing <br />In carrying out this work task, the Contractor shall: <br /> <br />a. Prepare a program for surveying and mapping, which <br />program shall not be init i ated unt il approved by the <br />State. <br /> <br />b. Prepare a topographic map or maps of selected areas at <br />the dam site to supplement existing mapping where <br />required. <br /> <br />c. Obtain aerial photographs (in color and in black and <br />white) of the project area for field and office use. <br /> <br />d. Bring in third order vertical, and second or third order <br />horizontal, survey control to the dam and appurtenances <br />area from state highway data in order to tie in USBR <br />mapping with respect to 1-70 construction and railroad. <br />Set a permanent baseline control monument on either <br />abutment of the dam. <br /> <br />e. Obtain spot elevations and locations where potential <br />interference problems with existing facilities have been <br />identified. <br /> <br />f. Conduct a preliminary location survey of project <br />features including dam, spillway and powerhouse. <br /> <br />g. Provide sufficient control to facilitate location of <br />geotechnical exploration features such as seismIc <br />traverses, test pits, auger borings, etc. <br /> <br />h. Obtain a sufficient number of c.ross-sectlons of the <br />river channel downstream from the proposed power plant <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.