My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150141 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150141 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150141
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Bill Number
SB03-110 Section 15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />transfers to municipal and industrial use, water conservation, growth limitations, and their <br />demand management practices. With the full compact development scenario, <br />consideration shall be given to other basins contributing to the Colorado River at points <br />west of the ColoradolUtah state line for an equitable carve out of water for development <br />in the Colorado mainstem. <br /> <br />4. IdentifY general project development issues and potential strategies for the <br />implementation of the CRRP. <br /> <br />The study tasks are: <br />Initial Work Tasks <br /> <br />Task 1 - Data Collection and Revie",:, <br /> <br />Task 2 - Compilation of Water Demand Studies on the Arkansas, South Platte and <br />Colorado River Mainstem <br /> <br />Task 3 - Final Scoping Activities <br />Colorado River Main-Stem Back!!round'Information <br />Task 4 - Overview of the Physical Environment <br />Task 5 -Institutional Setting <br />Alternatives and Strate!!ies <br />Task 6 - Overview of Water Supply Alternatives to the CRRP <br />Task 7 - Fonnulation of Project Configurations <br />Task 8 - Evaluation of Project Configurations <br />Task 9 - Documentation and Justification of Selected Configuration(s) <br />Task 10 - Project Development Strategies <br /> <br />Documentation <br /> <br />Task II -Study Documentation <br /> <br />Study Process <br /> <br />Study Tasks 1,2 and 3 involve collection and review of general existing data for the study and <br />finalize the scope of work. <br /> <br />The overview of the physical environment and institutional settings are described in Tasks 4 and <br />5 below under Detailed Work Tasks. The level of detail in Tasks 4 and 5 will be fairly general but <br />adequate for use in later study tasks. <br /> <br />Task 6 will briefly analyze: (I) The alternatives to the construction of the CRRP to allow <br />Colorado to develop its Colorado River compact entitlements and (2) alternatives to provide <br />increased water supplies to the east slope including, but not limited to construction of other water <br /> <br />Page 2 of12 <br /> <br />Contract SCOPE 5.1-03 BND <br />
The URL can be used to link to this page
Your browser does not support the video tag.