My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150141 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150141 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150141
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Bill Number
SB03-110 Section 15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />4. Budgeted meetings to be attended by Consultant staff members consist of the following: <br /> <br />Meetings Task Timeframe Number No. of <br /> Reference Consultant <br /> Staff <br />CWCB Staff None Every 2-3 weeks 9 2-3 <br />Coordination <br />CWCB Board None May, July, 3 I <br /> September <br />Kick-off Task 3 Study Inception I 5 <br />Workshop <br />Public Open None TDB by CWCB 2 3 <br />Houses <br />Data Repositories Task I First Month 7 2 <br />Water Users' Tasks 2 & 6 First two months 4 2 <br />Demands & <br />Alternative <br />Proiects <br />Regulatory Task 5 First two months 3 2 <br />Agencies <br />Screening Process Task 8 August and 2 5 <br /> Sentem ber <br />Review Draft Task 1]' Late September I 3 <br />Report <br /> <br />5. Three CRRP Corridors will be studied to demonstrate the broad range of possible project <br />configurations. The three selected Corridors will be evaluated at a Reconnaissance level <br />of detail to distinguish the major advantages and disadvantages of each alternative. <br />, <br /> <br />6. Costs will be based on cost curves, "rules of thumb", unit costs from previous project <br />estimates or bid tabulations already in the possession of the Consultant, and infonnation <br />provided by the CWCB at the Outset of the Study. Pumping costs and the value of <br />hydroelectric power generation will be based on current prices for large-scale project <br />operations. <br /> <br />7. The Consultant will consider only diversion points downstream of the Colorado and <br />Gunnison confluence consistent with the purpose of the study to evaluate utilization of <br />Colorado River compact entitlements downstream of any potential effects on existing and <br />likely future water diversions for beneficial use in the state. <br /> <br />8. Based on the Study's goal of not adversely impacting potential waters users, the <br />Consultant will review existing absolute and conditional water rights downstream ofthe <br />Gunnison confluence. <br /> <br />Page40f12 <br /> <br />Contmct SCOPE 5-1-03 BNO <br />
The URL can be used to link to this page
Your browser does not support the video tag.