Laserfiche WebLink
<br />.' <br /> <br />. . <br /> <br />g. Right of Way - Right of Way needs and costs will be <br />estimated in the report. <br /> <br />7. Chapter VI, Estimated Costs - to be funded by CWCB <br /> <br />a. Cost of Construction - Items 1 through 7 as detailed <br />in CWCB Guidelines will be discussed. <br /> <br />b. Fund Requirement Schedule - This item will be <br />developed as noted in CWCB Guidelines. <br /> <br />c. Operation, Maintenance and Replacement Costs - Data <br />provided by the Owner will be used to develop <br />requirements for these costs. <br /> <br />d. Emergency Operating Fund - The size of this fund will <br />be developed from CWCB Guidelines. <br /> <br />8. Chapter VII, Project Evaluation - to be funded by CWCB <br /> <br />This material will be developed with input from CWCB. <br /> <br />9. Chapter VIII, Financial Program - to be funded by CWCB <br /> <br />This material will be developed with input from CWCB. <br /> <br />PART C. ENVIRONMENTAL ASSESSMENT <br /> <br />No environmental impact is fOreseen from this project and no <br />environmental assessment will be developed with the report. <br /> <br />C. Task 3 - Cost Estimate for Work Program I <br /> <br />1. <br /> <br />Dam Break Analysis <br /> <br />$ 2,000.00 <br /> <br />2. <br /> <br />Feasibility Report <br /> <br />$11 ,400.00 <br /> <br />Total Cost, Work Program I <br /> <br />$13,400.00 <br /> <br />-4- <br /> <br />._....~, <br />