My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00369
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:22 AM
Creation date
10/5/2006 11:51:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153413
Contractor Name
Minnesota Canal and Reservoir Company
Water District
0
County
Gunnison
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />d. Water Rights <br /> <br />1. As provided by the Owner, water rights, permits <br />and dates of priority will be included in the <br />report. <br /> <br />2. As provided by the Owner, a probable yield of the <br />water rights will be included in the report. <br /> <br />e. Water Utilization <br /> <br />As the project under consideration is a rehabilitation <br />project, water utilization will remain relatively <br />unchanged. Therefore, the subject will not be covered <br />in the report. <br /> <br />f. Water Quality <br /> <br />The proposed project will not alter the water quality, <br />and this subject will not be covered in the report. <br /> <br />6. Chapter V, Plan of Development - to be funded by CWCB <br /> <br />a. Physical Plan - Only item 1 - Irrigation and item 6 - <br />Drainage as noted in CWCB Guidelines will be discussed <br />in the report. The other items are not applicable to <br />thi8 project. <br /> <br />b. Geologic Investigations - Existing geologic data will <br />be used for the Feasibility Report. <br /> <br />c. Design - Items 1-6 as noted in CWCB Guidelines. <br />Design criteria and standards used will be described <br />in the Feasibility Report. Existing canals and other <br />appurtenances will not be analyzed. <br /> <br />Items 7-14 as noted in CWCB Guidelines. These items <br />do not apply to this project and will not be a part of <br />the report. <br /> <br />d. Structure Pla~s - 1 & 2. Preliminary plans of <br />proposed construction will be made a part of the <br />report. <br /> <br />e. Drainage - Other than drainage as it relates to the <br />watershed tot&lly, it is not felt that this item <br />applies to this project. Drainage of the watershed <br />will be cover~d in other areas of the report. <br /> <br />f. Sedimentation - It is anticipated that the structure <br />outlet will n~ed to be lengthened, with no change in <br />the upstream ~levation. The report will not include a <br />study of sedimentation. <br /> <br />-3- <br /> <br />~. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.