Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />Conclusions <br /> <br />1. Kelton Heights Water District's present distribution system cannot <br />provide adequate fire protection. Much of the system consists of <br />old 2-inch mains and cannot provide adequate pressure. <br /> <br />2. Because this proposed project replaces all 2-inch line, capital <br />construction and maintenance costs will be reduced and the project <br />is financialy feasible if adequate funds are available at low <br />interest. <br /> <br />3. With present inflation and increasing construction costs this pro- <br />posed project should be initiated as soon as possible. <br /> <br />Recommendations <br /> <br />1. That Kelton Heights Water District review this feasibility report, <br />ament it if required and adopt it as final. <br /> <br />2. That Kelton Heights Water District contact the Colorado Water <br />Conservation Board and inform them of their intent to proceed with <br />application for funds. <br /> <br />3. That Kelton Heights Water District perform all necessary actions <br />for application of funds and contract out for engineering services <br />as soon as funds are available. <br /> <br />4. Depending on the Administrative charge selected, Kelton Heights <br />Water District should take measures to adopt new water rates. <br /> <br />2 <br />