Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Page Three <br />September 8, 1975 <br />Carbondale, CO <br /> <br />6. Estimated Project Costs: A summary will be made of the estimated <br />construction and total project costs in the form of an itemized <br />breakdown. This can be done using eweB format if desired. The <br />project capital requirements will be discussed and an allowance <br />made for projected price increases. Operation and maintenance <br />costs will also be itemized. <br /> <br />7. Project Financial Evaluation: Alternate financing schedules <br />shall be presented in this section to assIst the eweB in determin- <br />ing the applicant's payment capacity. A comparison of the re- <br />quired service rates and charges with neighboring entities will <br />be made. <br /> <br />8. Financial Program: Financial feasibility will be discussed in <br />this section using guidelines presented by the eweB. The rates <br />and charges shall meet the income requirements and result in a <br />project beneficial to the persons within the service area as <br />well as upgrade the overall system dependability. It shall be <br />demonstrated that the emergency reserve can be accumulated over <br />a period not to exceed 10 years. <br /> <br />METHOD OF PAYMENT <br /> <br />The report will be prepared for a lump sum fee of $5,000.00. <br />Portions of the study will utilize data from our previous report, <br />but the lump sum includes only new work required in addition to the <br />earlier 'report. A breakdown of the scope items is indicated on the <br />following Table. The Town will be asked to furnish information as <br />required. Time estimate for their people are not included in the <br />Table. Time input from an attorney for the water rights portion have <br />not been included. However, this should not be needed during the <br />report stage. <br />