My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00361
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:21 AM
Creation date
10/5/2006 11:51:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153369
Contractor Name
St. Vrain and Left Hand Water Conservancy District
Water District
0
County
Boulder
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Proposal - Enginel~g <br />Proposed Coffintop Dam <br />June 8, 1981 <br /> <br />Geologic Feasibility Study <br />and Reservoir Site <br /> <br />. <br /> <br />Page 3 <br /> <br />Limitations <br />This proposed investigation shall not include (1) the digging or <br />excavation of any pits, trenches, or adits; (2) the determination of any <br />geophysical responses; (3) the testing of any soil or rock samples; (4) <br />in situ testing of soil, rock, or the hydrologic environment, except that <br />the latter will be tested in a very preliminary way; (5) quantitative <br />analyses relative to bearing capacities, hydrologic regimes, slope <br />stability, or similar testing and calculations. <br /> <br />Exploratory drilling will be limited to 3 or 4 bore-holes that <br />provide NX size core. These holes are planned to be drilled along the <br />axis of the proposed dam, each to a target depth of 200 feet. In order <br />to obtain preliminary data on rock mass permeability, a' total of five <br />packer tests are planned to be conducted in each hole. The three- <br />dimensional, anisotropic hydraulic conductivities of the rock mass will <br />not be assessed by these pre 1 imi nary tests. <br /> <br />In addition, this investigation shall not address the engineering <br />geologic feasibility of (1) the project as a whole; or (2) ancillary <br />appurtenances such as relocated roadways or a tunnel. <br /> <br />In sUJlmary, the purpose of th is invest i gati on shall be to assess the <br />feasibility of the dam and reservoir sites in the Study Area in relation to <br />geological conditions as derived from a limited amount of geologic mapping, on <br />the surface in the area of the reservoir and dam site, and preliminary <br />subsurface investigation by exploratory drilling at strategic locations along <br />the dam axis, and havi ng pos it i ve ly assessed such feasi bi 1 ity, to formul ate a <br />geotechnical investigative program which may include (1) additional direct and <br />other, indirect subsurface exploration; and (2) more detailed surficial <br />geological analyses in identified potential problem areas. <br /> <br />STUDY AREA DESCRIPTION <br />As shown on the attached Exhibit A, the Study Area shall consist of the <br />dam-reservoir site which is located in north central Boulder County, <br />Colorado. It may include parts of or whole parcels of land which are o~med fee <br />simp le or 1 eased by persons or parti es other than those represented by the <br />Cl i ent. <br /> <br />UESLACKER ASSOCIATES. INC, <br />
The URL can be used to link to this page
Your browser does not support the video tag.