My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00361
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:21 AM
Creation date
10/5/2006 11:51:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153369
Contractor Name
St. Vrain and Left Hand Water Conservancy District
Water District
0
County
Boulder
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-. <br /> <br />Proposal - Engineerii, Geologic Feasibility Study <br />Proposed Coffintop Dam and Reservoir Site <br />June 8, 1981 <br /> <br />" <br /> <br />-. <br /> <br />Page 8 <br /> <br />In this regard and for the purposes of this investigation, the <br />Consultant and his subcontrac tors propose to enter such propert i es with <br />drill rigs, grading equipment, or other similar heavy equipment. In '. <br />addition, entry shall be required for surveyors, engineers, geologists, <br />technicians, and other tradesmen or professionals, and the required light <br />equipment whi ch is normally used for above-ground surveys and <br />investigations. Except for light trimming of vegetation for surveying <br />purposes, the digging of very shallow, small excavations with hand pick <br />or shovel, and disturbances that may result from entering such properties <br />with heavy equipment, no disturbances of the surficial environment will <br />be required. <br /> <br />2. The CHent agrees to provide the services of earth moving equipment with <br />operator so that a truck-mounted drill rig can gain access to safe <br />drill i ng sites. <br /> <br />3. The Client agrees to prOVide to the Consultant and his subcontractors all <br />technical literature in the Client's files which may relate to the <br />purposes,of this study. <br /> <br />TERMS AND CONDITIONS OF AGREEMENT <br />It is anticipated that the above described Feasibility Study for the <br />proposed Coffintop dam and reservoir site will take 18 weeks, plus allowance <br />for any time delays related to adverse weather conditions and other <br />circumstances beyond the Consultant's control. <br /> <br />All work outlined herein will be performed under the direction and <br />supervision of Ueblacker Associates, Inc. <br /> <br />The <br />$125,000. <br />proposal. <br />Any additional work ordered by the client will require a supplementary <br />agreement. <br /> <br />total estimated cost for the <br />A detailed Schedule of Time and <br /> <br />Study as outlined herein is <br />Cost elements accompanies this <br /> <br />UEBLACKER ASSOCIATES. INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.