Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Cost Estimate <br /> <br />The selected alternative is estimated to cost a total of $187,128. The planning costs will be <br />primarily absorbed by the South Platte Ditch Company. Design will be by Jack Odor <br />Engineering Services. The construction cost estimate, including contingencies, was provided <br />by Jack Odor Engineering Services and is included in Appendix B, <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning Costs <br />2. Design Costs <br />3. Construction Cost <br />4. Dirt work and dewatering <br /> <br />$100 <br />3,000 <br />164,028 <br />20,000 <br /> <br />Total Costs <br /> <br />$187,128 <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the project: <br /> <br />Task <br /> <br />Target Completion Date <br /> <br />I. <br />2. <br />3. <br />4. <br />5. <br />6, <br />7, <br /> <br />Complete Final Design <br />NRCS Approves Design <br />Bid the Job <br />Award the Bid <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />1/26/96 <br />1/31/96 <br />2/01/96 <br />2/09/96 <br />2/20/96 <br />3/30/96 <br />4/01/96 <br /> <br />5 <br />