<br />Cactus Park Reservoir.
<br />
<br />Another important feature is the proposed hydropower facility Revenues
<br />
<br />
<br />from the sale of power are intended to defray portions of the project cost.
<br />
<br />
<br />The addition of hydropower revenues transforms a marginally feasible
<br />
<br />
<br />agricultural project into a sound regional investment. The hydropower
<br />
<br />
<br />facility including forebay, penstock, and power plant will take advantage of
<br />
<br />
<br />almost 900 feet of vertical fall in a tributary drainage above Cactus Park
<br />
<br />
<br />Reservoir. A short canal will be required to convey water from the Cedar Mesa
<br />
<br />
<br />Ditch to the forebay reservoir. Project features are shown in Figure V-I
<br />
<br />
<br />(page ). Cost estimates for the Project are shown in the following table.
<br />
<br />
<br />Operation and maintenance costs have been estimated to total $130,000 per
<br />
<br />
<br />year. The annual repayment obligation will total approximately $1,400,000.
<br />
<br /> I SUMMARY OF ESTIMATED PROJECT COSTS
<br /> I Estimated Allowance Design & Right- Total
<br /> Construction for Cntgncs Management of-way Capital Cost
<br /> Project Features Cost @ 15% Costs Cost (Rounded)
<br /> I ~ar Mesa Ditch
<br /> vr. Enlargement 61,000 9,000 10,000 0 80,000
<br /> I Cedar Mesa Ditch
<br /> Enlargement 123,150 18,500 20,000 25,300 187,000
<br /> I Cactus Park Resv. 7,736,750 1,160,500 1,350,000 400,000 10,700,000
<br /> Big Ditch Ext. 23,500 3,530 15,000 28,000 70,000
<br /> I Cedaredge Canal 558,400 83,800 135,000 102,000 880,000
<br /> Current Creek Ditch 50,000 7,500 16,000 16,000 90,000
<br /> I Transfer Ditch Enlrg. 15,000 2,250 3,000 0 21 ,000
<br /> I Upper Cedar Mesa
<br /> Feeder 69,200 10,380 23,000 22,500 126,000
<br /> Cedar Mesa Power
<br /> I Plant Feeder 52,000 7,800 12,000 9,000 81,000
<br /> Power Plant and * *
<br /> I Appurtenances 2,855,000 428,250 75,000 3,000 3,365,000
<br /> TOTAL PROJECT $15,600,000
<br /> .
<br /> I * As Estimated by Colorado-Ute Electric Association
<br /> I -3-