Laserfiche WebLink
<br />I <br /> <br />I. <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />Cactus Park Reservoir. <br /> <br />Another important feature is the proposed hydropower facility Revenues <br /> <br /> <br />from the sale of power are intended to defray portions of the project cost. <br /> <br /> <br />The addition of hydropower revenues transforms a marginally feasible <br /> <br /> <br />agricultural project into a sound regional investment. The hydropower <br /> <br /> <br />facility including forebay, penstock, and power plant will take advantage of <br /> <br /> <br />almost 900 feet of vertical fall in a tributary drainage above Cactus Park <br /> <br /> <br />Reservoir. A short canal will be required to convey water from the Cedar Mesa <br /> <br /> <br />Ditch to the forebay reservoir. Project features are shown in Figure V-I <br /> <br /> <br />(page ). Cost estimates for the Project are shown in the following table. <br /> <br /> <br />Operation and maintenance costs have been estimated to total $130,000 per <br /> <br /> <br />year. The annual repayment obligation will total approximately $1,400,000. <br /> <br /> I SUMMARY OF ESTIMATED PROJECT COSTS <br /> I Estimated Allowance Design & Right- Total <br /> Construction for Cntgncs Management of-way Capital Cost <br /> Project Features Cost @ 15% Costs Cost (Rounded) <br /> I ~ar Mesa Ditch <br /> vr. Enlargement 61,000 9,000 10,000 0 80,000 <br /> I Cedar Mesa Ditch <br /> Enlargement 123,150 18,500 20,000 25,300 187,000 <br /> I Cactus Park Resv. 7,736,750 1,160,500 1,350,000 400,000 10,700,000 <br /> Big Ditch Ext. 23,500 3,530 15,000 28,000 70,000 <br /> I Cedaredge Canal 558,400 83,800 135,000 102,000 880,000 <br /> Current Creek Ditch 50,000 7,500 16,000 16,000 90,000 <br /> I Transfer Ditch Enlrg. 15,000 2,250 3,000 0 21 ,000 <br /> I Upper Cedar Mesa <br /> Feeder 69,200 10,380 23,000 22,500 126,000 <br /> Cedar Mesa Power <br /> I Plant Feeder 52,000 7,800 12,000 9,000 81,000 <br /> Power Plant and * * <br /> I Appurtenances 2,855,000 428,250 75,000 3,000 3,365,000 <br /> TOTAL PROJECT $15,600,000 <br /> . <br /> I * As Estimated by Colorado-Ute Electric Association <br /> I -3- <br />; <br />